Little more than 15 minutes later we came alongside the casualty, a newly purchased commercial fishing vessel, which had issued a Mayday due to engine failure and the strong tidal conditions off St Aldhelm's head. Both of the crew members onboard were OK so we decided to leave them where they were and place a crewmember of ours aboard to assist with rigging the tow and steering. Steve gallantly volunteered to do the heroics and quickly got things rigged on the heavily rolling vessel.
As the tow progressed towards Swanage, Dave, today's navigator, called Portland Coastguard and requested an updated weather forecast. As suspected this was promising a Force 4 South-Easterly wind which would have left the casualty rather exposed on our mooring. Consequently, Martin made the sensible decision to continue the tow up to Poole where we could guarantee the security of the casualty vessel.
Once at the Town Quay in Poole the vessel was rapidly secured alongside with the assistance of the local Coastguards. We then returned home (minus Paul E who elected to remain in Poole so that he could join his partner for some light shopping).
By about 12.30 we were back in the boathouse and ready for further duties. Textbook stuff.
And of the course the chicken was collected and delivered to the market where it all sold I hope.












.jpg)
There are 42 in total, enough to replace all the badly worn steel ones that are in the slipway at the moment.
Allan from RNLI Shoreworks came to station and we installed 7 new rollers into the slipway in the boathouse. The new rollers are made of nylon and with the new spindles are hopefully going to be maintenance free as they require no greasing (good news for me!). Its important that the rollers are the correct height to allow the boat to rock a little bit but not too high so it rocks over to one side and stays there. We did this with an engineers square from the main part of the keelway.
So that's 7 down 35 to go! The steel rollers weigh about 4o kilos each so that's about 1.5 tons of steel to move :o( we as a station have been asked to fit the next 20 the rest will be fitted by contractors as there's some repair work to be done on the plates that support the rollers. Once that's done they'll all be levelled with a laser (some how!) and measurements taken so I can keep an eye on them and make sure they're not wearing..jpg)
.jpg)
.jpg)








